Construction Change Orders: Scope, Price, Schedule, and Documentation
Most construction payment fights are not about whether the work was done. They are about whether the paperwork that authorized it exists. This brief maps the sequence that decides those claims.
- Work changes three ways: a signed change order, a unilateral directive the contractor must follow while price is unresolved, and conduct that changes the work without paper.
- A constructive change is extra or different work compelled by owner conduct rather than a formal order; it is provable, but only with contemporaneous documentation.
- Standard general conditions, including the AIA A201 family, impose short written-notice periods for claims — commonly measured in days from the triggering event.